Engineering Center
     In order to bring about continuous development of Zongshen Group, preparations for the construction of Engineering Center started in December of  2001, and   whole  of the Engineering Center has  been put into use in  2004 . Invest budget for the Center  is  over  30 million US dollars and coverage  nearly 10  thousand  square  metres.
     Taking international advanced matrix management as its  managing  structure ,  Center will construct integrated CAD / CAPP / CAM design and manufacturing platform and establish process engineering technology standard characteristic of Zongshen features (ZSPAP) by the way PAS system (Project Achievement Supervision) and CAPP ( Computer- aided  Production  Process ).Such precision equipment as machining center and such technologies as robot welding chassis,digital¨Ccontrolled bending pipe, fast model will be utilized in the Center to achieve design and manufacturing on test verification.

     The Engineering Center will do its ultimost to set up technical innovation system characteristic of Zongshen features in the field of research and development of process, process equipment and special machine tool to provide strategic support platform for development of products manufactured in Zongshen Group.