Testing Center It covers
over 4000 square meters, and has been put into use
in May of 2002. the first stage investment to the
testing center was 12 million US dollars.
The
Center includes more than 23 professional
laboratories, and its major equipment and
technology are introduced from abroad. The center
possesses advanced test and management tech, and can simulate environment
experimentation and is the first - rate testing
center on testing of motorcycle and relevant
products in China.
The testing Center can conduct
all develop testing items for motorcycle and
engines. And in particular has the international
level air drain and combustion laboratory,
transmission laboratory, CVT AUTO clutch
laboratory, chassis emission laboratory, engine
dynamic and emission laboratory, fatigue life span
laboratory and so on. In addition, the testing
center possesses the domestic first-rated noise
processing technology, network system, which can
guarantee development of product with own
intellectual property in design
verification.